Accuracy depends on the decision
A forecast is an input to a decision, so accuracy only means something relative to that decision: its horizon, the level of detail it needs and the cost of being too high versus too low. A weekly staffing decision and a quarterly purchasing decision need different forecasts. Write the decision down first; otherwise a leaderboard number tells you little.
Bias is not the same as error
Error says how far forecasts miss; bias says whether they miss in the same direction. The playbook lists them as separate measures: forecast bias as the mean signed error over a rolling period, which shows systematic over- or under-planning, and error relative to a seasonal-naive benchmark at the decision's horizon, which shows whether a method earns its complexity.
Inventory policy makes the link concrete: the right safety stock depends on forecast error and lead-time variability, not only on average demand. If you have not measured those, that comes before a software purchase.
Benchmark simple methods before buying complex ones
Across 100,000 series and 61 methods in a large forecasting competition, the strongest results came from combinations of approaches rather than a single complex model, and pure machine-learning entries generally lagged. A later competition on retail sales found some machine-learning methods more accurate than statistical benchmarks, but on a large, well-instrumented retail dataset with many related series. Competition results may not carry over to your data, so the practical step is a holdout test of a simple, well-chosen combination against any sophisticated model on your own series.
Governing overrides
Across more than 60,000 forecasts at four firms, judgmental adjustments improved average accuracy at three of them, but small adjustments and upward adjustments often made forecasts worse. Whether an override helped depended on the firm, the product and the direction of the change.
The evidence points to structure rather than prohibition: allow overrides for material exceptions, record the reason and direction, and compare the adjusted forecast with the baseline so each planner and each kind of override has a track record. Judgment is not the enemy of forecasting; unmeasured judgment is.
The path, step by step
These steps come from the Demand forecasting playbook. Each has a checkpoint you can observe.
-
01
Name the decision the forecast serves
Write down the decision, its horizon, the level of detail required and the cost of being high versus low. A weekly staffing decision and a quarterly purchasing decision need different forecasts.
CheckpointA one-page forecast brief: decision, horizon, granularity, error cost and current baseline.
Common failureOptimising statistical accuracy on a series that no planner actually uses.
-
03
Establish a reproducible baseline
Build a seasonal-naive benchmark and one exponential-smoothing or ARIMA challenger. Backtest both on a holdout of at least two full seasonal cycles before touching the live plan.
CheckpointOut-of-sample error and bias for each model, at the horizon the decision actually uses.
Common failureChoosing a model by training fit, or by how sophisticated it sounds.
-
05
Govern overrides with exception rules
Allow human edits only for named exceptions, with a reason code, direction and owner. Compare the edited forecast with the untouched baseline every month.
CheckpointOverride rate, reason mix, and forecast value added for edited versus unedited forecasts.
Common failureLetting the loudest planner edit anything, then blaming the model when the plan misses.
-
06
Run a monthly forecast review that retires complexity
Review error, bias and value added by model and override. Delete models, hierarchy levels and reports that do not improve a decision.
CheckpointA short value-added table and a decision log showing what was removed, kept or retested.
Common failureAdding a new model every quarter while nobody can name the one the business plans on.
What this guide does not settle
The overrides evidence is four firms in supply-chain planning and the competitions use particular datasets and metrics. Accuracy measures the forecast, not the downstream cost of its errors, which is why the decision comes first.