Risk is not one thing
Supply-chain risk can be split into breaks, delays, forecast errors, procurement, receivables, inventory and capacity risks, and each needs a different mitigation. A single generic risk register, or a single buffer, will misallocate effort. The split is a practitioner framework: it helps structure judgment but does not quantify the risks or prescribe how much buffer to hold.
Mitigation and contingency work as a portfolio
Mitigation reduces the chance or impact of a disruption; contingency is the response after it occurs. They are not substitutes to choose between once. The best mix depends on how likely and how long disruptions are and on the firm's cost structure, and relying on a single strategy is usually dominated by a portfolio. This result comes from a model with illustrative parameters; real disruption likelihoods are hard to estimate and supplier behaviour is more complex than the model.
What a disruption can cost
Firms that experienced supply-chain disruptions underperformed matched peers over the following years and carried higher equity risk, and the damage lasted beyond the announcement window. That points to disruption impairing operations and confidence for longer than the event itself. The study is observational: unobserved differences may contribute to both the disruption and the underperformance.
Resilience balances vulnerabilities and capabilities
The same event can cripple one network and be absorbed by another, because of visibility, flexibility, collaboration and buffering. The resilience framework therefore assesses both vulnerabilities and capabilities rather than prescribing maximum inventory or multiple suppliers. A related view puts resilience in a combination of redundancy and flexibility, supported by a culture that takes disruption seriously and practises the response.
For a single-sourced item the questions are concrete: what is the consequence if this supplier fails, how long would the gap last, what can bridge it (stock, a qualified alternative, a design change), and what does each cost to keep ready?
The path, step by step
These steps come from the Supply chain and supplier resilience playbook. Each has a checkpoint you can observe.
-
01
Map dependencies and single points of failure
Map tier-one and critical tier-two suppliers, sites, ports and shared services. For each, estimate the operational impact and the time to recover if it stopped.
CheckpointA dependency map with the ten highest-impact exposures and a recovery-time estimate for each.
Common failureCounting suppliers as if two sources in the same region were independent.
-
03
Segment suppliers and choose develop or exit
Classify suppliers by spend, criticality and performance. For strategic or constrained suppliers, set a joint improvement plan; for replaceable poor performers, qualify an alternative.
CheckpointEvery critical supplier has a named strategy, owner and review date.
Common failureApplying a standard scorecard to every supplier and changing nothing.
-
04
Choose buffering versus bridging deliberately
For each top exposure, compare the cost and recovery time of a buffer (stock, capacity, dual source) against a bridging action (collaboration, visibility, flexible routing).
CheckpointA decision per exposure with cost, recovery time and the failure mode it addresses.
Common failureBuying inventory for every risk, including the ones inventory cannot cover.
-
05
Stress-test and rehearse the response
Run a tabletop or simulation of the most plausible disruption. Walk through detection, decision rights, customer communication and recovery, and fix the gaps you find.
CheckpointA rehearsed response with named decision rights and a measured recovery time.
Common failureKeeping the continuity plan in a folder that nobody has opened.
What this guide does not settle
These sources are a taxonomy, conceptual frameworks, a model with illustrative parameters and an observational study. None gives the point at which a second supplier pays back; that depends on the likelihood and length of disruption and on your costs, which you have to estimate.